2018 Winter works March Progress

Published: Thursday, 08 March 2018

User Rating: 0 / 5

Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive
 

The boat has been in the wet dock at Debdale for a few weeks and the joiner is working on the internal woodwork. Unfortunately progress is going to be little slower than originally planned due to the cold weather and one of the guys at Debdale breaking his leg leaving them short staffed, however there is no rush as long as things are finished to go to Crick in May.

Lining

 To date the main front cabin has been relined with oak faced ply making it much smarter and lighter.

kitchen

The kitchen work top on the starboard side has been shortened to match the port side. A new storage cabinet to house the wine boxes and radio is going in this corner.

table2

table

The Table has been refitted with a small shelf above

Tv unit base

On my last visit the joiner had installed the base of the TV unit, so my job was to run in the cables needed to connect the TV with the cabinet containing the sat receiver, Roku streamer, power , ariel etc and to put the power cable that will power it all in place

Hits: 180