Chelonian was built in 1994 and is now 23 years old so I thought it was about time it had some tlc to extend its life and improve some of the facilities. These works are being carried out over the winter in a number of stages.
Hull and Fabrication works.
This included zinc coating the hull and several welding jobs to improve the hull life, as well as adding a new skin tank for engine cooling and a new flexiable drive coupling.
Full details here
Exterior painting and internal Joinery
Full details here
Upgrading the Hybrid system with a new Control Box and a new water cooled motor.
Full details here
Internal Painting, some woodwork and changes to safety system including fitting a Man Overboard System.
Full details will appear here