Rufford Branch Breach - Update 24th July

Published: Friday, 24 July 2015
Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive
 

The overpumping system appears to be all in place but not currently operating.
The leak in the fabric dam has been stopped so the work area is now dry.
There is a big tanker pump on site which looks like it may be to pump out the lock chamber.
There is a van on site at the East side of the culvert (opposite side to the collapse) -presumably the CCTV inspection team.
Water levels in the pound lock 5-6 are still dropping slowly, but lock 6-7 is still running in the bywash of lock 7, probably due to the environment agency pumping from local drainage in to the canal.

CRT Update out https://canalrivertrust.org.uk/notice/4117/locks-1-to-7-rufford-branch-of-leeds-and-liverpool-canal End of August for estimated reopening.

IMG 20150724 131349

Hits: 4180

We use cookies to improve our website and your experience when using it. Cookies used for the essential operation of this site have already been set. To find out more about the cookies we use and how to delete them, see our privacy policy.

  I accept cookies from this site.
EU Cookie Directive plugin by www.channeldigital.co.uk