2018 Part 3 Aqueduct to Crick

Published: Wednesday, 03 January 2018
Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive
 

Via Shroppie

~ 25th August to ?? September

On the night of 15/16th March there was a major breech between locks 1 and 2 on the Middlewich branch draining the whole pound between the locks and causing extensive damage to the embankment.  It is likely that it will take 6 months or more to repair effectively closing this route for the whole if the 2018 summer season.

An alternative route does exist but this includes the large commercial Manchester Ship Canal between Ellesmere Port and the mouth of the River Weaver, and the lower Weaver which is also still used by large commercial traffic. While this is a challenge it is possible in a narrowboat given proper planning and preparation. Unfortunatly this route is now closed until further notice by a collision between the steamer Daniel Adamson and the lock gates at Marsh lock.

Unfortunatly the logistics of navigating the Manchester Ship Canal mean that even if Marsh lock is reopened it is unlikely that we could take advantage of it, and I am not planning to shell out the £100plus for survey etc on spec.

Having rung around the various boatyards I have placed a deposit with Crick Marina with a booking until after the Crick show next year. Lets hope the watersupplies to the Crick summit hold out.

As a result we have no option but to proceed back down the Shropshire Union to Autherly and from then to the winter mooring at Crick.

Aqueduct to Crick

Hits: 5191

We use cookies to improve our website and your experience when using it. Cookies used for the essential operation of this site have already been set. To find out more about the cookies we use and how to delete them, see our privacy policy.

  I accept cookies from this site.
EU Cookie Directive plugin by www.channeldigital.co.uk